Customization: | Available |
---|---|
After-sales Service: | Lifetime Technical Support, Parts Supply etc |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
4 Axles Low Flat Bed Goose-neck Semi-trailer
Vehicle Description | |
Overall dimension | 16000*2550*950mm |
Curb weight | 9000kg |
Loading weight | Approx. 60000kg |
Trailer Description | |
Material | Carbon steel |
Axle | FUWA 13T*4 sets |
Suspension | Mechanical |
King Pin | 90# or 50# traction pin |
Landing leg | JOST, or other brand |
Tire specification | 235/75R17.5 |
Tire quantity | 16units |
Brake system | 4S/2M, dual line air brake, drum brake system |
Others | |
Tool box | 1 set standard tool box, 2 spare tire racks |
Light | Tail lamp with turn signal, brake light & reflector, side lamp etc. |
Painting | 1 coat of anti-corrosive prime, twice coats of final paint. |
Color | Optional |
Spare Tire Carriers | 2 pieces |
Optional | Axle: BPW, HUAJING Suspension: air suspension ABS |
We CLW Heavy Industry Co., Ltd are a professional manufacturer and exporter which is concerned with the design, development and production of more than 300 kinds of trucks, semi-trailers, and storage tanks. More details are as follows.
FAQ
1. Q: How about the quality of trucks of your factory?
A: Our trucks get ISO 9001:2008 and CCC, B&V and other related certificates. The chassis and spare parts come from the original manufacturers with anti-fake label.
2. Q:How many years of your company's service, especially after-sale service?
A: CLW Heavy Industry Co., Ltd has been in this field for nearly 15 years and has strong production and distribution capability, we can produce your products in 15 working days. We offer 1 year after-sale service.
3. Q:Is there any advantages of your price?
A: CLW Heavy Industry Co., Ltd is one of the most important suppliers of Sinotruk, Shacman, Dongfeng, FOTON and FAW, which provides guarantees for reasonable price and good quality.
4. Price term: FOB, CIF
5. Payment: 30% deposit after order confirmation, 70% balance should be paid before delivery. All by T/T, L/C.
6. Delivery time: 25 working days after payment is received.
7. Standard Steering: Left-hand drive, if you need Right-hand drives, please inform us, will make special order for you.